|
Wilmington Friends School Case Story
^ Back to Projects |
PDF Version |
Print this Page
|
Apex Engineering Incorporated prepared the site design plans for a gymnasium/athletic complex addition that consisted of two new basketball courts, a wrestling facility, locker rooms, storage equipment rooms, and staff office space. Professional services included performing a topographic survey of a portion of the site in the area of the additions, parking lot, and stormwater management design. The project also included the preparation of a record minor land development plan for the 38,000 square foot addition, lines and grades, and erosion and sediment control plan, and entrance/exit plans.

|
^ Back to Projects |
PDF Version |
Print this Page
|