|
Appoquinimink High School Case Story
^ Back to Projects |
PDF Version |
Print this Page
|
Apex Engineering Incorporated prepared the site design plans for a new 210,000 square foot high school, with stadium seating for 4,000 people and 8 playing fields. A topographic survey, grading, drainage, stormwater management, erosion & sediment control, parking and roadway designs were performed. This project is currently under construction.

|
^ Back to Projects |
PDF Version |
Print this Page
|