• WHO WE ARE
  • WHAT WE DO
  • PROJECTS
  • TEAM
  • CONTACT
Menu

Apex Engineering Incorporated

27 West Market Street
Newport, DE 19804
302.994.1900 (P) /302.994.9099 (F)
Engineered Success™

Your Custom Text Here

Apex Engineering Incorporated

  • WHO WE ARE
  • WHAT WE DO
  • PROJECTS
  • TEAM
  • CONTACT
IMG_2737.JPG

Appoquinimink High School

 Apex was responsible for evaluating two potential sites for the second proposed high school in the district. Our team prepared property and topographic surveys of the two sites, as well as, environmental studies for the properties. Apex worked with the Appoquinimink School District to prepare potential layout studies of the sites in order to help the school board make the most informed decision for the growth of the district. Once the site was chosen, Apex prepared the site construction design plans for the new 210,000 square foot high school.  The design included a 4,000 seat football/soccer stadium with all-weather surface, an eight lane track, tennis courts and eight natural grass playing fields. The site chosen straddled both New Castle County and the Town of Middletown jurisdictions.  Apex worked diligently with both territories to obtain the necessary approvals to complete the project. We performed site grading, drainage, stormwater management design, erosion and sediment control, parking and roadway design. Apex’s team worked closely with the State Department of Transportation to coordinate the new entrance that was being tied into a roadway design upgrade of Bunker Hill Road and the construction of a new traffic circle.  The site design also had to accommodate the future Route 301 corridor that will someday be constructed adjacent to the school property.

Appoquinimink High School

 Apex was responsible for evaluating two potential sites for the second proposed high school in the district. Our team prepared property and topographic surveys of the two sites, as well as, environmental studies for the properties. Apex worked with the Appoquinimink School District to prepare potential layout studies of the sites in order to help the school board make the most informed decision for the growth of the district. Once the site was chosen, Apex prepared the site construction design plans for the new 210,000 square foot high school.  The design included a 4,000 seat football/soccer stadium with all-weather surface, an eight lane track, tennis courts and eight natural grass playing fields. The site chosen straddled both New Castle County and the Town of Middletown jurisdictions.  Apex worked diligently with both territories to obtain the necessary approvals to complete the project. We performed site grading, drainage, stormwater management design, erosion and sediment control, parking and roadway design. Apex’s team worked closely with the State Department of Transportation to coordinate the new entrance that was being tied into a roadway design upgrade of Bunker Hill Road and the construction of a new traffic circle.  The site design also had to accommodate the future Route 301 corridor that will someday be constructed adjacent to the school property.

Appoquinimink School District Logo.png
IMG_2740.JPG
IMG_2742.JPG
IMG_2744.JPG
IMG_2746.JPG
IMG_2751.JPG
You must select a collection to display.

Engineered Success™

27 West Market St. Newport, DE 19804

Copyright © 2016 Apex Engineering, Inc. -- All Rights Reserved.